260,620m
Rod and rope
Duct proved and roped for mainline and drop builds by a six-member confined-space certified crew.

WHAT SKATELTAKES ON
A fibre build stalls in the gaps between contractors: the drill crew finishes and the splicers are two weeks out, or the locate ticket lands after the trench is open. SKATEL runs all six disciplines out of Acheson with its own crews, so the sequence is a scheduling decision rather than a negotiation. Larger drilling scopes are the one exception, supported by established partner contractors across Alberta and British Columbia.

260,620m
Rod and rope
Duct proved and roped for mainline and drop builds by a six-member confined-space certified crew.

236,800m
Cable placed
Fibre, copper, coaxial and CAT5: aerial, buried and in-duct, including aerial lashing.

192,000
Locate tickets
Cleared across Edmonton and surrounding areas by five dedicated locate technicians.

44,600m
Directional drilling
Horizontal directional drilling since 2021, now on a Vermeer D23x30, two 6x6 units and one 10x15.
CREWS ANDEQUIPMENT

01Telecom
9 units
Splice and aerial10 units
Crew and load8 units
Bore and tie-in4 units
Reel and haul31 units across 4 groups, owned and operated out of Acheson.
THE CREWSAND THEIR KIT
4 splicers
6 technicians
5 technicians
In-house + partners
Aerial & buried
In-house

#120F, 10466 Fulton Dr, Acheson, AB T7X 6A1
START ACONVERSATION
Every enquiry gets one point of contact, who stays on the project through to close-out.