260,620m
Rod and rope
Duct proved and roped for mainline and drop builds by a six-member confined-space certified crew.

Telecom infrastructure contractor based in Acheson, Alberta. Splice, place, drill, locate and civil, all under one contract.
ZERO
Reportable incidents
Five consecutive years, across drilling, confined-space entry and aerial work.
2,883
Splice locations
Fibre and copper, completed since 2019 across MXU, residential and commercial builds.
WHAT SKATELTAKES ON
A fibre build stalls in the gaps between contractors: the drill crew finishes and the splicers are two weeks out, or the locate ticket lands after the trench is open. SKATEL runs all six disciplines out of Acheson with its own crews, so the sequence is a scheduling decision rather than a negotiation. Larger drilling scopes are the one exception, supported by established partner contractors across Alberta and British Columbia.

260,620m
Rod and rope
Duct proved and roped for mainline and drop builds by a six-member confined-space certified crew.

236,800m
Cable placed
Fibre, copper, coaxial and CAT5: aerial, buried and in-duct, including aerial lashing.

192,000
Locate tickets
Cleared across Edmonton and surrounding areas by five dedicated locate technicians.

44,600m
Directional drilling
Horizontal directional drilling since 2021, now on a Vermeer D23x30, two 6x6 units and one 10x15.
BUILT FOR THE FIELD
Every rod-and-rope technician is confined-space certified and carries full field support equipment.
Two OTDR units, OPM and OLT meters. Every splice location is traced and recorded before handover.

“No job is so important and no service so urgent that we cannot take time to perform our work safely.”
TEN SERVICELINES










Following the list

HOW A SCOPEMOVES

01
We walk the print with you, confirm the territory and the disciplines involved, and price against real crew availability rather than a nominal rate. Budgetary numbers for planning, firm numbers once the design is issued.

02
Our own locate technicians clear the tickets (the same team that cleared 192,000 of them since 2019), so the crew arriving to open ground is not waiting on a third party's schedule.

03
Directional drilling, rod and rope, cable placement and the vault and pedestal work run as one sequence under one supervisor. Hydrovac daylighting and restoration are coordinated with the drilling crew, not subcontracted after the fact.

04
Four splicing trucks, five ribbon fusion splicers, two OTDR units. Every location is traced, the power budget measured, and the results recorded against the location ID before the crew leaves site.

05
A dedicated QC specialist reviews the completion package before submission: as-builts, test results, photos and ticket closures. What is reported is what happened on site, including when it went wrong.
THE RECORD,YEAR BY YEAR
Seven-year total 260,620 m
| Year | Rod & rope (m) | Cable placed (m) | Splice locations | Locate tickets | Directional drilling (m) |
|---|---|---|---|---|---|
| 2019 | 4,820 | 6,800 | 58 | 20,000 | Not run this year |
| 2020 | 6,800 | 11,000 | 104 | 32,000 | Not run this year |
| 2021 | 68,000 | 18,000 | 362 | 46,000 | 2,000 |
| 2022 | 75,000 | 38,000 | 578 | 34,000 | 6,000 |
| 2023 | 45,000 | 42,000 | 443 | 26,000 | 7,600 |
| 2024 | 25,000 | 63,000 | 648 | 18,000 | 11,000 |
| 2025 | 36,000 | 58,000 | 690 | 16,000 | 18,000 |
| Total | 260,620 | 236,800 | 2,883 | 192,000 | 44,600 |
Figures as reported in the SKATEL Communications Business Portfolio, 2025. A dash means the discipline was not run that year: directional drilling began in 2021.
All three marks are the property of their issuers and are shown as issued.

Registered Alternate Locate Provider
The Utility Safety Partners designation for contractors registered to perform locates in Alberta. SKATEL's five locate technicians work under it, across Edmonton and the surrounding areas.

Registered member contractor
SKATEL's safety program and documentation are held on file in ISNetworld, where prime contractors review and grade them as part of prequalification.

Held by technicians on staff
Cisco certifies people rather than companies, so this one belongs to the technicians who hold it rather than to SKATEL.
THE YARD,COUNTED
What each crew carries, and the certifications behind it, are on the capabilities page.

9 units
Splice and aerial
10 units
Crew and load
8 units
Bore and tie-in
4 units
Reel and haul31 units across 4 groups, owned and operated out of Acheson.
Telus
I&R, drops and mainline
Rogers
Installation and repair
Shaw
Installation and repair
ELC
Utility locating operations

#120F, 10466 Fulton Dr, Acheson, AB T7X 6A1
START ACONVERSATION
Every enquiry gets one point of contact, who stays on the project through to close-out.